Concrete Calculator

The concrete truck is scheduled for Thursday and the supplier is asking how many yards you want. Guess low and the crew stands around while you panic-order more — and the seam where the second load meets the first never fully disappears. Guess high and you have paid roughly $150 per yard for concrete that hardens in the truck.

This calculator answers with real math. Enter your slab length, width, and thickness, add a waste allowance, and it gives you cubic yards rounded up to the nearest quarter-yard (how ready-mix is actually sold) plus the equivalent number of 80-lb bags if you are mixing by hand. Every figure traces to a manufacturer spec sheet, and the formula is shown with your own numbers below the results.

Your project, calculatedInstant results · Math shown
Volume
33.3 cu ft
Exact cubic yards
1.23 cubic yardsbefore waste allowance
Order this much
1.5 cubic yardswith 5% waste, rounded up to the nearest ¼ yard
Or in 80-lb bags
59 bagseach yields ~0.6 cu ft (Quikrete #1101)
How we calculate this (with your numbers)

Volume = 10 ft × 10 ft × (4 ÷ 12) in = 33.33 cu ft

Cubic yards = 33.33 ÷ 27 = 1.23 yd³

With 5% waste: 1.23 × 1.05 = 1.30 yd³ → rounded up to the nearest ¼ yard: 1.50 yd³

Bags (80 lb, 0.60 cu ft each): 35.00 ÷ 0.60 = 58.3 → always round up: 59 bags

How the math works

Worked example

A 10 × 10 ft patio slab, 4 inches thick, 5% waste allowance:

  1. Volume = 10 × 10 × (4 ÷ 12) = 33.33 cu ft
  2. Cubic yards = 33.33 ÷ 27 = 1.23 yd³
  3. With 5% waste: 1.23 × 1.05 = 1.30 yd³ → order 1.5 cubic yards
  4. Or in bags: 33.33 × 1.05 ÷ 0.60 = 58.3 → 59 eighty-pound bags

Enter these exact numbers into the calculator above and you will get the same result — that is the point. No black box.

Limitations

Frequently asked questions

Exactly 27. A cubic yard is a 3 ft × 3 ft × 3 ft cube. This calculator divides your slab volume in cubic feet by 27 to get cubic yards — the unit ready-mix trucks sell by.